Paragraph 84: Why Demand Is Rising – and How Early Technical Input is Critical to Project Success

Doug Johnson

Paragraph 84: Why Demand Is Rising – and How Early Technical Input is Critical to Project Success

Paragraph 84 Planning Policy - What are the Key Considerations to Meet the Requirements? 

Designing a new home in open countryside has always required compelling justification.  Under the National Planning Policy Framework (NPPF), Paragraph 84 is one of the few legitimate planning pathways for the creation of new homes on rural or Green Belt land. It is a stringent route – intentionally so – that demands both exceptional design quality and demonstrable sustainability and environmental considerations.

The term ‘Paragraph 84′, is the latest iteration of the policy, which was first established in 1997 to set out how new homes can be built in open countryside. 


Setting a High Bar for Design Quality and Sustainability


For architects and planning consultants, Paragraph 84 is an opportunity to create inspirational, landmark architecture. The requirements of the policy set a high bar for architects to achieve with their approach to design. 

But it is also a policy area where planning authorities demand robust technical evidence from the earliest design stages. These projects have to be designed sensitively to their location and are subject to rigorous review at each stage – from concept, technical design, planning and construction. 

Without addressing this, proposals will fail to pass the design review panels and achieve planning, leading to costly redesigns and delays. 


What is Paragraph 84 Designed to Achieve?

Paragraph 84 exists to protect and enhance our most sensitive landscapes. It is a national policy pathway that allows new dwellings to be approved for development in open countryside or on Green Belt land when:

•    The design quality is exceptional
•    The architecture reflects and enhances the location
•    The new home would achieve exemplary environmental performance
•    The proposal results in a dwelling that could not have been delivered using conventional development criteria.

Paragraph 84 homes must blend into the landscape and deliver outstanding environmental performance.  Projects are typically large, bespoke private homes, where form and materiality relate directly to the context of the site. Schemes draw inspiration from local heritage or the landscape. For example, one of our Paragraph 84 projects sited close to a river was interpreted as two interlocking river boats, or another design near an ancient burial mound was built into a hillside.

Paragraph 84 is, at its core, a policy about contextual, site-specific, sustainable landmark design.


Why the Number of Paragraph 84 Projects is Increasing

At Mesh, we have seen a sharp rise in Paragraph 84 projects in the past year and that trend is continuing. Several converging social, environmental and planning policy trends are driving this:

  • People are moving out of cities – High net worth individuals are increasingly buying rural land to build homes that deliver space, security, privacy and connection to nature. Remote working and advances in technology have accelerated this shift, as has a growing desire to move away from highly urbanised environments.
  • A cultural appetite for exceptional homes – The ‘Grand Designs effect’ and social channels such as Instagram have fuelled the ambition for highly individual, statement homes in rural environments.
  • Planning policy is becoming more rigorous – Local authorities are enforcing sustainability and environmental design requirements far more strictly. Paragraph 84 schemes must now present high-level, evidence-based technical data earlier in the design process and with far greater precision.
  • National planning policy is reinforcing sustainability – Paragraph 84 favours homes that embody sustainable construction, low-carbon energy strategies and responsible material use. As national guidance tightens, planning authorities expect quantifiable evidence rather than simply narrative intent.
  • Demand amplified by Paragraph 84e – Even stricter criteria apply to proposals within National Parks and Areas of Outstanding Natural Beauty, where the architectural and technical design must reach an even more exceptional threshold. This further increases reliance on specialist input for both planning and building engineering.

The Role of Building Performance Engineering in Paragraph 84 and Why Early Involvement Matters

Paragraph 84 homes do not secure planning consent without high-quality technical input and evidence-based data. Architectural excellence must be matched with detailed environmental studies and data and that requires specialist expertise in renewable technology, performance engineering and building physics.

Mesh is one of the UK’s most experienced building-performance specialists in this area and has supported many Paragraph 84 projects since the inception of the policy. Its engineers work with architects and planning consultants typically from RIBA Stage 2, ensuring proposals are grounded in robust, defensible technical data long before design freeze.

The key areas of building performance engineering to consider are summarised below.

1. Design Review Panel Preparation
Successful Paragraph 84 applications depend heavily on the quality of evidence presented to Design Review Panels (DRPs). These panels expect a clear, data-backed narrative that explains:

•    The sustainable design strategy
•    The performance metrics and modelling that underpin design decisions
•    The rationale for innovation and how that responds to site context
•    How the scheme meets the ‘truly outstanding’ and ‘exceptionally designed’ criteria of the planning policy.

This preparation must be done collaboratively across the design team, with architects, planning consultants and building engineers all aligned. The strength of this early narrative often determines whether a scheme progresses or stalls at the first review.

2. Sustainability and Building Physics Analysis
Because Paragraph 84 homes are held to the highest standards of environmental performance, applicants must provide robust technical analysis early in the design process. This typically includes:

•    Part L thermal efficiency and heat-loss calculations
•    Part O overheating analysis – often requiring full TM59 dynamic thermal modelling, particularly for large homes with a high level of glazing
•    Part G water-efficiency calculations
•    Energy performance modelling.

The technical evidence must demonstrate that the building can achieve year-round comfort, comply with overheating regulations, and meet or exceed building-performance requirements. Applying passive measures, such as ventilation strategy and thermal efficiency, play a critical role in compliance with the latest regulations.

3. Energy Strategy and Low Carbon Technology Feasibility Studies
A comprehensive energy strategy is a core expectation under Paragraph 84. Design teams must explore low carbon or renewable energy technologies such as:

•    Air and ground source heat pumps
•    MVHR and passive ventilation strategy
•    Underfloor heating
•    Solar PV and battery storage.

The objective is not simply to specify ‘green’ technologies, but to demonstrate – through accurate, interpretable data – that the proposed home will operate efficiently, integrate well with the landscape, and deliver reasonable long-term running and maintenance costs. The Design Review Panels increasingly expect a credible, quantifiable whole-site strategy, not simply a list of technologies.

4. Whole Life Carbon and Material Assessments
Given the size and bespoke nature of many Paragraph 84 projects, design teams must account for the impact of both operational and embodied carbon. Data typically required includes:

•    Embodied-carbon calculations
•    Material sourcing such as the volume of reclaimed stone or building material versus materials transported to site and from where
•    Circularity and waste-minimisation principles
•    Justification for material choices in relation to the local area and the project’s sustainability objectives.

DRPs will look for a clear link between the architectural concept, the landscape context, and the environmental logic behind building material decisions and product specifications.

5. Building Services Strategy 
A common pitfall in Paragraph 84 proposals is not addressing the building services design at an early stage. For these often-large homes, the services strategy has implications for form, structure and landscape integration. Early-stage clarity is therefore required on:

•    Sizing of plant and equipment 
•    Ventilation strategy and riser requirements
•    Space planning for plant rooms and roof-mounted equipment
•    Any constraints that may affect massing or design freeze.

Without this early work, design and planning teams risk significant redesign at a late stage – which can seriously delay planning or even undermine the planning case.

6. Ongoing Workshops and Team Co-ordination
Paragraph 84 planning approval depends on a cohesive, aligned design team. Workshops throughout RIBA Stages 2 and 3 ensure that:

•    The environmental strategy and building efficiency match the architectural intent
•    Technical modelling supports the design narrative being presented to DRPs
•    The whole team can confidently articulate the detailed evidence behind the proposal
•    Potential risks of non-compliance are identified well before design freeze.

Planning authorities expect clearly reasoned, data-supported submissions – and this level of co-ordination is essential to delivering that.


What are the Common Pitfalls to Avoid in Paragraph 84 Projects?

Despite the growing demand, design and planning teams can fall into predictable traps. The consequences can be severe – lost design time, repeated panel cycles, unnecessary cost, or complete refusal.

1. Involving building-performance consultants too late
Design teams should avoid completing early concept designs without taking account of the implications of thermal performance, overheating risk or services integration. 

Unless engaged early, by the time the building engineers are brought in, it can be impossible to accommodate regulations or planning requirements into the design – incurring additional work, time and cost.

2. Attending DRP meetings without sufficient technical evidence or data

Design Review Panels expect detailed data, not aspirations. Without robust modelling, sustainability metrics or strategy justification, the proposal is unlikely to be endorsed.

3. Overlooking overheating in highly glazed designs
Large Paragraph 84 homes frequently feature a high level of glazing to allow panoramic views over the countryside. This increases the risk of overheating. Compliance requires either the simplified Part O route or TM59 dynamic modelling – and most high-specification designs require the latter. Failing to allow for this will result in design amendments that can significantly delay the planning process.

4. Freezing the architectural design before the services strategy is confirmed
If plant rooms are undersized, or if roof-mounted equipment cannot be accommodated, the entire form or massing of the building may need to change. This is especially problematic in landscape-led designs or partially sub-terranean structures.

5. Underestimating the impact of whole life carbon and building material specifications
Many panels now expect quantified embodied carbon assessments, along with clear justification for material choices and sourcing. Without early data, design freeze cannot be achieved.

6. Assuming compliance can be ‘dealt with later’
For Paragraph 84 homes, sustainability and building performance are integral to the planning case, not a post-design add-on. A non-compliant design will not pass planning, regardless of how well it is presented.

7. Ignoring running costs and operational energy
High-end homes can be extremely costly to operate if the energy strategy is not well thought through. DRPs are increasingly asking about longevity, efficiency, maintenance and whole-site energy planning.

Why Preparedness is Essential

Paragraph 84 opportunities are expanding – but so are expectations. 

The most successful proposals are those where architects, planning consultants and building performance engineers collaborate from the earliest stages, ensuring design intent, narrative, sustainability and technical evidence evolve together and are fully aligned.

This strategy enables design and planning teams to approach DRPs with confidence, clarity and fully defensible data. For architects and planning consultants, engaging the right technical partner early is now not simply beneficial but absolutely critical to the project’s success.

Images: Green Fox Farm designed by Hawkes Architecture



SHARE THIS POST WITH YOUR NETWORK

by Jen Wallace • 13 November 2026
The growing effects of climate change are having a significant impact on our communities and action is clearly needed across the built environment. Jen Wallace, Managing Director of building performance specialist Mesh looks at the importance of embodied carbon in building climate resilience. Both the planning system and Building Regulations have an important role to play in shaping both new developments and existing buildings in ways that minimise carbon emissions. This will help to build resilience to climate impacts in our communities, from rising temperatures and sea levels, to increased rainfall and extreme weather events. What is the M5 Mitigation Policy? Ambitious new standards and requirements were introduced by the planning authorities in Devon, Plymouth and South Hams under the DEV32 planning policy framework. This encourages new development to go further than current Building Regulations and includes embodied carbon as a key consideration in the planning process. The M5 mitigation policy is one of the named measures under the planning framework used by West Devon, Plymouth and South Hams Councils to prioritise the re-use of buildings by testing the embodied carbon payback specifically for demolition and rebuild projects. Why does Measuring Embodied Carbon Matter? There is a clear case for replacing existing buildings with more energy efficient homes and facilities as that will reduce operational carbon year-on-year. However, this has to be balanced with the level of embodied carbon generated by new build projects. In order to assess embodied carbon, Mesh has developed a carbon calculator for South Hams and West Devon Councils specifically to help architects, developers and planning consultants to generate the carbon data needed to meet the M5 test. The actual and target energy performance of a new building can be compared against the energy consumption of the existing building to generate the annual operational carbon saving of the replacement facility. This allows the carbon savings to be calculated over the councils’ required 25-year assessment period for comparison against the embodied carbon cost of demolition and rebuilding. If the calculation shows that the ongoing operational carbon savings of the new building cancel out the embodied carbon debt within 25 years, demolition and rebuilding can be justified. If this is not proven, it strengthens the case for refurbishment rather than new build. Specialist Support for the DEV32 Planning Process Mesh’s building performance engineers provide specialist support to architects, planning consultants and developers working under the DEV32 planning framework. This includes whole life carbon analysis, building fabric assessments and building services engineering specification to demonstrate data-led technical rigour and policy alignment for the planning process. For more details about Mesh’s Embodied Carbon Calculator tools – see https://www.mesh-energy.com/resources/embodied-carbon-calculator . About Mesh Mesh offers a range of design and engineering services to help organisations in the public and private sectors to improve the energy efficiency of new and existing buildings, housing and estates. This includes support for architects; planning; thermal modelling and overheating analyses; carbon reduction strategies; feasibility studies for renewable technologies; MEP design, and regulatory compliance.
People walking under colorful autumn trees in a park
by Doug Johnson • 3 November 2026
Learn how Mesh Energy enhances energy efficiency and accelerates decarbonisation and a look at a recent project for Forestry England
by Doug Johnson • 28 October 2026
Decarbonising a large building estate is rarely as simple as replacing one technology with another. Doug Johnson, Founding Director of energy and building performance specialists Mesh, looks at the importance of data-led decision-making. For Estates Directors responsible for large property portfolios, the pressure to decarbonise is coming from multiple directions. Organisations need to reduce operational carbon, transition away from fossil fuels, improve energy efficiency, control escalating running costs and maintain occupier comfort, particularly when climate change is leading to more buildings overheating in summer. At the same time, buildings still need to perform their primary function, capital budgets are constrained and major interventions have to be costed and planned. Against that background, it can be tempting to start with the technology – such as heat pumps, solar PV, insulation and new heating systems. However, whilst all of these technologies may form part of the solution, they are rarely the right starting point. Why Assessing Building Performance Matters For a large and diverse estate, the first question should be much simpler – how are our buildings actually performing? This distinction matters because two apparently similar buildings can have very different energy performance profiles depending on age, fabric, heating and hot water systems, controls, condition and patterns of occupation. Understanding these variables will make the difference between a credible long-term decarbonisation strategy, and a costly and disruptive programme of interventions that could fail to deliver the optimum results. Estates directors and strategic property leads are under growing pressure to reduce operational costs, cut carbon emissions and prepare building estates for the transition away from fossil fuels. Yet most estates were never designed as a single asset. They are often a portfolio of buildings from different decades, built to different standards, used in different ways and, in many cases, still running on fossil fuels. Decarbonisation such an estate should not be viewed as a single project. It needs a strategic, evidence-led programme, rather than an individual renewable technology specification. Understanding Actual Buildings Not Assumptions Mesh recently completed a detailed building performance assessment and energy strategy for Hampshire & Isle of Wight Fire & Rescue Service, examining its headquarters in Eastleigh and six fire stations selected to represent the age, scale and typology found across its wider 62-building estate. Occupancy patterns varied enormously, from office-based staff working regular hours in fire stations to facilities that stand largely empty until a crew returns from a call-out and needs the building to become comfortable within minutes. Building fabric, heating controls and hot water demand all varied widely. This is true of most large estates, whether in emergency services, local authorities, education, healthcare or the commercial sector. Treating a diverse portfolio as if it were one building type, or applying a single technology across the board, consistently produces less value and, in some cases, worse outcomes for occupants. Building the Evidence Base The starting point for any credible decarbonisation strategy should be data. For the Hampshire & Isle of Wight project, that meant analysing three years of energy billing data for each of the seven buildings assessed to understand how consumption varied through the year and how each heating system responded to changes in external temperature. This produced a benchmark energy use intensity figure for each building typology, allowing direct comparison against national emergency services benchmarks and establishing a clear baseline against which future improvements can be measured. Alongside this, detailed building fabric assessments quantified heat loss through U-value calculations for roofs and walls, and tested the impact of a range of insulation interventions and materials against both capital cost and payback period. Occupancy patterns, heating and hot water systems, and controls were also assessed. Once this evidence base was in place, solutions could be identified for improvement and a strategy for implementation developed. An Evidence-led Energy Strategy A genuinely evidence-led strategy will rarely point towards a single solution. For some buildings in this estate, relatively low-cost measures made the most sense: Centralising heating controls. Aligning heating schedules with actual occupancy levels rather than fixed assumptions. Replacing stored hot water cylinders with instant systems where demand was variable and unpredictable. In several buildings, radiators needed resizing to improve both energy efficiency and occupier comfort where rooms had previously been reconfigured. The analysis supported a move towards air source heat pumps (ASHPs) to reduce space heating energy consumption by around 50 per cent. However, a full transition to ASHPs raised a significant challenge – heat pumps operate at lower flow rates than gas boilers. This means existing radiator and pipework systems are not always compatible without significant capital investment and operational disruption. Disruption is a key issue for emergency services, as it is for many organisations. The solution was a hybrid approach – heat pumps for handling the majority of annual heating demand, with gas heating retained as back-up during the coldest periods. For an emergency services estate where continuity of service is non-negotiable, this delivered a substantial reduction in carbon and running costs without the capital cost or disruption of complete system replacement. Why This Approach Matters for Estates Directors For facilities or estates manager responsible for a complex property portfolio, this project illustrates a broader principle. Understanding how buildings are actually used and perform through evidence-based analysis – energy data, fabric performance, occupancy patterns and modelling – allows capital investment to be targeted at the remediation work which will deliver the greatest benefit in terms of cost and carbon reduction. According to Carrie Dickson, Energy and Sustainability Officer for Property and Facilities at Hampshire & Isle of Wight Fire & Rescue: “ Our aim with this project was to optimise the energy performance of each building and to apply those learnings to our wider estate across Hampshire and the Isle of Wight. We now have the evidence-based analysis needed to understand which buildings perform well and where improvements and technical adjustments are best targeted to reduce energy consumption. The project data and feasibility studies will also be helpful to inform larger capital projects, both new build and refurbishment.” A Practical Starting Point The Hampshire Fire & Rescue estate project reinforces that the decarbonisation of any building should always be evidence-led. When you understand energy consumption, building fabric, services, controls, occupancy patterns and operational requirements for different building types, solutions can be modelled and optimised, and investment prioritised against energy, carbon and cost reductions and practical deliverability. For Hampshire & Isle of Wight Fire & Rescue Service, this approach has created a clearer route towards improving the performance of its existing buildings and progressively reducing the reliance on fossil fuels. For other organisations facing the same challenge, the principle is equally applicable. About Mesh Mesh offers a range of building performance engineering and M&E design services to help organisations in the public and private sectors to improve the energy efficiency of new and existing buildings, housing and estates. This includes support for architectural design, the planning process, thermal modelling and overheating analyses; carbon reduction strategies; feasibility studies for renewable technologies; MEP design and engineering, and regulatory compliance.
17 October 2026
Sustainability, impact and integrity form the basis of Mesh's culture where creativity and fun are still very present. As part of this ethos, each year we hold a series of volunteering days for our team. 11 of our colleagues from as far afield as Portugal, Exeter and Bristol recently joined the Surrey Society to work with rangers at West Horsley Place – a 400-acre estate near Guildford – and help maintain some of their ancient woodland. The team lent a hand with ‘coppicing’. This practice involves felling a tree to create a living stump called a ‘stool’ which supports regrowth into new, fast-growing poles or rods. Regular cutting of the stools can extend the life of a tree for centuries, provide sustainable materials for a range of uses, and encourages biodiversity. Doug Johnson, Founding Director of Mesh: "We had a fantastic day in the fresh air which was followed by our monthly team meeting in the beautiful grounds and a social dinner afterwards. Thank you to the Surrey Society for giving us the opportunity to volunteer on another of their projects. This independent charity does some great work to encourage people to explore the outstanding landscape in Surrey. This fits so well with Mesh's sustainability values." 
12 October 2026
Mesh has been announced as a runner up for Energy Consultancy of the Year at the National Energy Efficiency Awards. This latest accolade follows our success in winning Regional Energy Efficiency Consultancy of the Year at the South East Energy Efficiency Awards. According to Doug Johnson, Founding Director of Mesh: "As one of the smaller, specialist consultancies, this was a significant achievement for such a prestigious award and in a highly competitive category. The awards event was a fantastic celebration of innovation and achievement in improving energy efficiency across the built environment. Our teams are committed to excellence in both building performance analysis and building services design – delivering practical solutions and strategies for our clients to accelerate decarbonisation and improve the energy efficiency of new and existing homes and buildings. It is wonderful to have our team's talent and hard work recognised with this national accolade from the industry." 
7 October 2026
Adapting heritage buildings for modern use creates a particular engineering challenge – how do you deliver comfort and energy performance, within the constraints of a historic building? Doug Johnson, Mesh Founding Director of building performance specialists Mesh, shares his insight from a recent project. When we talk about successful heritage transformations, the conversation usually focuses on the architectural design and the restoration process. Less visible but equally important, is the role of building services engineering. Change of use breathes new life into historic buildings. However, achieving year-round comfort for visitors and occupiers of galleries, offices, hospitality or retail can be challenging, not least when occupancy levels fluctuate. Historic buildings are expected to deliver the same standards of comfort, environmental control and operational performance as modern buildings, yet they were never designed to accommodate contemporary MEP systems. Getting that balance right requires different thinking. A Grade II listed Georgian townhouse in London's Mayfair was recently transformed into a space for contemporary art. This provides a useful illustration of the principles involved and how the challenges were addressed. Dating back to the 1730s, the six-storey building in Mayfair was once home to the Burlington Fine Arts Club. It has now been sensitively converted into a suite of contemporary art galleries for Sadie Coles HQ. The objective was not simply to install heating and cooling. It was to create a comfortable, flexible, efficient and futureproof internal environment whilst ensuring that the engineering services remained almost entirely invisible. The Importance of Designing Around Occupancy A key consideration for intelligent building services design is looking at the predicted occupancy levels and whether these will vary. Museums, galleries, visitor attractions, civic buildings and cultural venues can all move rapidly from quiet periods of low occupancy to large events with significant increases in heat gain and ventilation requirements. Rather than designing for a single occupancy assumption, modelling multiple use scenarios provides a much clearer understanding of how a building needs to perform throughout the year. By analysing different occupancy patterns, environmental conditions and operational requirements, MEP systems can be sized more accurately to avoid both underperforming and over-engineered solutions which increase energy consumption. In heritage projects, this approach is particularly valuable because space for plant and services is often limited. Every piece of equipment needs to justify its inclusion. Early Co-ordination and Integration with the Architectural Design Heritage and listed buildings rarely offer generous service routes. Unlike new-build projects, where risers, ceiling voids and plant spaces can be designed in from the outset, historic buildings often require services to be threaded through a series of constrained voids. This challenge becomes even greater in tall, narrow buildings such as townhouses, where plant may need to serve multiple floors through restricted vertical routes. The lesson is clear – building services engineering has to be designed in from the outset. Early collaboration between architects, engineers and conservation specialists is essential to establish whether the proposed systems are feasible, where equipment can be located and how services can be integrated within the building fabric. The earlier this co-ordination takes place, the greater the opportunity to avoid compromise, reduce project risk and optimise energy efficiency. Increasing Capacity for Heating and Cooling in a Heritage Setting A common response to increasing heating or cooling demands is simply to add more equipment. In many heritage settings, that option is not possible. Planning restrictions, minimising visual impact and noise levels, and conservation requirements often limit the number and location of external plant units. Roofs, courtyards and rear elevations frequently offer little flexibility which demands a more intelligent approach to system design. On the Sadie Coles gallery project, instead of increasing the number of external units, a zoned strategy was developed which matched available plant capacity to individual rooms based on anticipated occupancy patterns and the predicted demand for heating and cooling. This allowed the available capacity to be used with greater energy efficiency whilst maintaining compliance with planning constraints. The broader lesson is that building performance is not solely determined by the quantity of equipment installed. Understanding how spaces are used often unlocks opportunities to achieve enhanced performance within the available infrastructure. Maintaining a Clean Aesthetic The most effective building services design is often the least visible whilst meeting performance requirements. This is particularly true in heritage settings where restored architectural features, historic detailing and carefully considered interiors should remain the focus. Achieving this requires close collaboration with the wider design team. Diffusers, grilles, fan coil units, controls and service routes must be carefully integrated into the architecture rather than be imposed upon it. In gallery environments, there is an additional consideration – the services engineering must not distract from the exhibits themselves, either visually or acoustically. This demands a level of co-ordination and design discipline that goes beyond compliance. Passive Design Matters Any building should be as energy efficient as possible and passive measures often provide some of the most effective opportunities to improve comfort whilst minimising energy consumption. In the Mayfair gallery, a glazed roof lantern was both a beautiful architectural feature and a potential source of overheating. Rather than relying solely on active cooling, actuated roof lights were incorporated into the glazing above to allow warm air to be purged naturally from the space below. Combined with natural ventilation through restored sash windows, this approach reduced cooling demand whilst improving thermal comfort. These principles are not new, but remain highly relevant. Understanding airflow, solar gain and natural ventilation can often deliver significant benefits alongside the design of mechanical systems. Futureproofing Heritage Assets Buildings that have survived for centuries have often done so because they have adapted over time. The services strategy should support that continued evolution. Futureproofing does not necessarily require major additional investment. Sometimes it simply means incorporating connection points, spare capacity or flexible infrastructure that allows future adaptations to be made more easily. In the case of the gallery project, provision was included for supplementary low-level electric heating should the building use change. Such measures may never be required, but they provide resilience and flexibility that can extend the useful life of the building with the least disruption possible. Services Engineering to Support Heritage Buildings Successful heritage refurbishment is not about choosing between conservation and performance. It is about achieving both. The most effective building services solutions are those that support the architectural and client vision, improve comfort, reduce energy consumption and remain largely unseen by the people using the building. When done well, engineering becomes part of the fabric of the building rather than an addition to it. That is ultimately what intelligent building services design should achieve – modern performance delivered in a way that respects the past whilst preparing buildings for the future. The Project Team: Client: Sadie Coles HQ Lead contractor (design and delivery): Work Ltd Architectural partner: Giles Reid Architects MEP design / building performance: Mesh About Mesh Mesh offers a range of design and engineering services to help organisations in the public and private sectors to improve the energy efficiency of new and existing buildings, housing and estates. This includes support for architects; planning; thermal modelling and overheating analyses; carbon reduction strategies; feasibility studies for renewable technologies; MEP design, and regulatory compliance.
Mesh is working on the first phase of an estate rejuventation programme at Waterperry Gardens
7 October 2026
Building performance specialist Mesh is providing a range of multi-disciplinary services for a new build scheme and estate rejuvenation programme at Waterperry House and Gardens, including building performance and embodied carbon analysis, BREEAM assessments and MEP services design and engineering.
7 October 2026
Mesh has been appointed to work on three new care home projects – in Cambridge, Barnstaple and in the Exmoor National Park – providing assistance with regulatory compliance, analysis to mitigate overheating, energy strategy development, and low-carbon services design, engineering, and specification. There has been a significant increase in demand for Mesh's building performance services for care home projects this year. There are a number of drivers: Running costs - there is a clear need to reduce operational costs in care homes given global uncertainty around energy prices. Comfort - It is vitally important to maintain the comfort of residents and vulnerable people, and particularly to reduce the risk of overheating in light of climate change and rising temperatures in the summer months. Performance - New build care homes and extensions have to perform over time rather than simply meet minimum requirements for statutory compliance. Sustainable living - In a competitive care home market, more sustainable living accommodation means lower bills for residents and enhanced wellbeing.  Dylan Ross of Mesh: “Care homes are occupied 24/7 so building performance and energy efficiency really matters. We are seeing more care home developers and operators look beyond regulatory compliance and at how their buildings will actually perform over time – in terms of energy use, thermal comfort and maintenance implications. Our role is to bring building performance and services design together using evidence-led solutions to help inform decision making and deliver buildings for social care that maximise comfort for residents and minimise energy consumption, carbon emissions and running costs for care home operators.” Mesh specialises in improving the energy efficiency of both new and existing buildings, and works with care home operators, developers and architects.
Building performance specialist Mesh has developed an energy strategy for Hampshire Fire Service
7 October 2026
Building performance specialist Mesh has worked with Hampshire Fire & Rescue Service to improve the energy efficiency of its building estate and support decarbonisation.
 Jen Wallace, Managing Director of building performance specialist Mesh
12 September 2026
Building performance and M&E engineering specialist Mesh has appointed Jen Wallace as Managing Director

Subsribe to memo from mesh