Future-proofing listed buildings: restraints and recommendations

Rebecca Boehme

Future-proofing listed buildings: restraints and recommendations

Listed buildings ooze character and charm, and it’s often their quirks and historic merits which their owners fall in love with. However, living in them comfortably is not always plain sailing, especially during the winter months. Single glazed windows, nooks and crannies let draughts in, and heating systems are often old and running on fossil fuels which gurgle and crank up to churn out heat which flows out of the building just as quickly as it comes in. 


With sustainability and rising energy prices now at the forefront of people’s minds we’re often asked can we make improvements to redress their circumstances? Where can we install insulation? Can we consider moving away from oil or gas as the primary heat source and use an air source or ground source heat pump? The detailed answers are as unique as the buildings themselves, but a common approach can be employed every time to answer these questions.


So, what is the best approach for this kind of project?



Whilst the starting point to approach a Listed Building project is the same as with any other building - consider the fabric first to reduce the heat demand – the main difference is that Listed Buildings will have heritage and historical constraints as to what physical changes are allowed.


All proposed changes will need agreement with the local authority conservation officer. Therefore, the first task is to appoint a local heritage consultant who will have experience of the history of the regional vernacular to offer the most appropriate advice as to what may be permitted.


Secondly, form a collaborative team with your architect, structural engineer, heritage consultant and energy consultant to work towards the best outcome within the design constraints.


"


Heritage bodies advocate for a holistic approach so where thermal improvements are to be proposed then they will need to be justified (within the heritage impact part of the heritage statement) showing due regard to the whole house approach and its principles. Historic England provide a great deal of guidance which can be viewed at
Energy Efficiency and Historic Buildings | Historic England.


Katie McAndrew, Hutton + Rostron

Top considerations for the fabric:

1

First and foremost, with any fabric improvements you must consider its breathability. How can moisture be absorbed and emitted from the building and kept in balance to prevent rot?

2

You must be realistic about what can be achieved. It’s important to be flexible balancing your own wants and needs to live in the building comfortably with the historical features of the property.



3

The roof needs to look exactly the same before and after any improvements, so is it possible to remove the roof tiles, insulate the roof and put the tiles back without compromising on the look of the building?



4

Can you replace the existing floor with a sustainable and historically relevant type of construction to add in underfloor heating and put it back? Is there enough depth for the system? It’s not always possible due to the floor structure.



5

Improving the external walls is largely affected by their historical value, condition and the method of construction that will most likely have to be retained. In some cases, you can insulate the walls with a layer of sheep’s wool but it’s not always practical or considered in keeping with the property.



6

Glazing may have historical imperfections and value or warped over time, and as is likely to be considered irreplaceable and so may require refurbishment of the timber frames. However, part of the house can be upgraded to high performance glazing if one or more facades are not deemed to be historically important. If it is not possible to upgrade the windows, then the choices tend to be limited to secondary glazing and/or very heavy curtains to prevent some of the heat loss.


Top considerations for the fabric:

1

Once any fabric improvements have been carefully considered by the heritage consultant and approved by the local authority conservation officers, then a room-by-room heat loss model is required to be able to assess whether a low flow temperature heat pump system will make the house warm in winter. It may be the case that certain rooms will not reach the optimum 20 degrees room temperature all year round. In which case a discussion with your design team will be required to understand how supplementary solutions may be employed

2

Ground source heat pumps don’t generally require planning permission as the pipework is all buried underground in the garden. Air source heat pumps do require planning permission as the historical aspects need to be taken into consideration in the context of aesthetics and conservation areas.


3

There may be significant challenges to overcome when integrating new mechanical and electrical systems with legacy systems within a historical structure. The legacy building services infrastructure may require a complete overhaul to fit with the new heating system so a building condition assessment survey might be required. Consider the disruption and cost of this undertaking.


4

Finally, as custodians of buildings of historical importance, think of any additions such as underfloor heating, a heat pump and added insulation as mere temporary solutions which can be easily removed if necessary to preserve the character of the building.


Case study

Here are the results from a feasibility study for a Grade II listed building project in an area where electricity was the only energy utility available, with improvements to the C15th fabric limited to the ground floor and roof.


Technology Capital cost (£) Annual running cost (£) 20-year total cost (£) Annual CO2 emissions savings (kg) Annual CO2 emissions (kg)
Electric 3,400 14,745 298,260 0 10,550
Oil 7,500 3,860 84,680 -15,140 25,690
ASHP 33,190 5,585 144,920 6,550 4,000
GSHP (boreholes) 84,830 4,375 172,290 7,420 3,130
Bivalent ASHP & oil 39,780 4,850 136,770 5,710 4,840
Bivalent GSHP, boreholes & oil 33,730 4,390 121,510 6,550 4,010
Stylized white building model with gray roofs and light blue windows on a plain background
Color-coded 3D house model with a text legend on the left and blue roof, yellow walls, and green extension
Colorful 3D house with a blue roof, yellow walls, pink end, and green side extension
Colorful 3D drawing of a house with blue roof, orange walls, pink side, and yellow windows

SHARE THIS POST WITH YOUR NETWORK

Building performance specialist Mesh explains the Net Zero Carbon Building Standard
1 July 2026
In this article, we examine the new UK Net Zero Carbon Buildings Standard, why it was was developed and potential issues around implementation.
Affordable and social housing where overheating is an increasing risk
30 June 2026
Overheating in affordable housing is a growing issue caused by climate change. We can assist with sustainable strategies for new homes and retrofit programmes.
22 June 2026
Mesh Founding Director Doug Johnson has been invited to join the judging panel for this year’s Building Innovation Awards. These awards are a fantastic opportunity to showcase the incredible industry pioneers, innovations and technical advancements in UK construction. Together with a panel of influential clients and Tier 1 decision makers from across the construction sector, he will be evaluating the entries ahead of the awards celebration in Birmingham on 29th September 2026. The Building Innovation Awards the only awards scheme in the built environment sector to be recognised with the prestigious Outstanding Awards Trust Mark from the Independent Awards Standards Council (IASC). Doug Johnson: "It is an immense privilege to join such as esteemed panel of clients and industry professionals. We have so much to be proud of in the built environment and these awards are a brilliant opportunity to celebrate innovation which keeps our sector advancing, particularly in the areas of sustainable development and construction as we work towards net zero and the vital need to accelerate decarbonisation. Innovation is absolutely central to that." More details about the awards here .
15 June 2026
Building performance specialist Mesh has completed a building services design project for a new flagship art gallery in Savile Row – Sadie Coles HQ. The six-storey Grade II listed Georgian townhouse in London’s Mayfair, which dates back to the 1730s, has been fully restored and transformed by lead contractor Work Ltd, to create a unique space for contemporary art. The building, once home to the Burlington Fine Arts Club in the 19th century, had been bomb damaged in World War II and used as offices post-war. It has now been sensitively reinstated as a space for artists to exhibit their work in a part of London which has a long association with contemporary art. The key aim of this extensive refurbishment project was to work to a fast-track programme for the gallery’s opening to coincide with the Frieze Art Fair. Mesh was appointed to develop a holistic MEP building services strategy, from concept through to detailed design, and in keeping with the character and constraints of this heritage building. Enhanced control of the internal environment was required to maintain visitor comfort all year round and in the context of continually fluctuating occupancy levels, including events for up to 200 people. Working within a Grade II listed building required a highly considered approach at every stage – historic architectural features were revealed and restored internally and externally, and extensive structural improvements were required to accommodate art loadings. These factors had to be reflected in the services design and specification. Mesh used dynamic thermal modelling for different scenarios of use to understand the heating and cooling loads required and to allow the services to be accurately sized for each room or gallery. Two priorities were cooling and for each area to be individually controlled according to occupancy levels. Discrete but robust heating and cooling provision was designed for the gallery areas and the MEP services were concealed in void spaces to avoid impacting on the architectural features of the building or the layout of the galleries. Plant and equipment had to be sited in compliance with stringent planning requirements, which limited the number, size, position and visual impact of the external units. Passive measures were introduced to reduce energy consumption and included actuated openable rooflights in a glazed lantern to purge warm air during the day and reduce the reliance on the active cooling system. Giles Reid, Giles Reid Architects: “The new gallery has succeeded in its ambition – to reaffirm that London has an important position in the global art world. This was a complex project which had to be delivered in just nine months from planning approval for the fixed deadline for opening, and despite having to carry out extensive structural alterations. The building is performing well from a services perspective, including at the opening event which was attended by around 800 guests. The M&E design in contemporary art spaces like this must never detract, visually or acoustically, from the art being exhibited and this has been successfully achieved. This is a fantastic statement building which has been acclaimed and the Client is thrilled. It is a credit to everyone involved that this historic building has been brought back into use for contemporary art.” Doug Johnson, Founding Director of Mesh: “This project demonstrates exactly what intelligent building services engineering should deliver – an integrated, high-performance solution to deliver year-round-comfort for visitors and users of the building whilst maintaining a clean aesthetic. Working within a Grade II listed building with complex planning restrictions required genuinely creative engineering rather than a conventional response. We are really proud to have contributed to this outstanding building transformation.” The Project Team: Client: Sadie Coles HQ Lead contractor (design and delivery): Work Ltd Architectural partner: Giles Reid Architects MEP design / building performance: Mesh About Mesh Mesh offers a range of design and engineering services to help organisations in the public and private sectors to improve the energy efficiency of new and existing buildings, housing and estates. This includes support for architects; planning; thermal modelling and overheating analyses; carbon reduction strategies; feasibility studies for renewable technologies; MEP design, and regulatory compliance. Architectural images - Joseph Asghar
Building performance specialists Mesh names in the Sunday Times Best Places to Work List 2026
1 June 2026
Building performance specialists Mesh names in the Sunday Times Best Places to Work List 2026
Four people posing at an awards event, one holding a framed certificate, in front of a logo backdrop
20 May 2026
Mesh Energy wins Energy Efficiency Consultancy of the Year for innovative low-carbon solutions. Contact us for expert energy strategies.
Indoor botanical garden with arched glass roof and elevated walkways over lush greenery
by Doug Johnson 1 May 2026
Explore battery storage tech for sustainable building design. Improve energy efficiency & manage costs effectively. Contact us today!
Scattered wooden letter tiles spelling words on a tabletop, with several tiles stacked and overlapping.
by Rhiannon James 1 May 2026
Understand renewable energy acronyms for sustainable design. Contact us for feasibility studies to enhance your project.
Interview title slide: “Delivering Success for Paragraph 84” with portrait of Rob Hughes on dark background
7 April 2026
Rob Hughes discusses navigating Paragraph 84 for rural planning success. Contact us for expert advice on sustainable building design.
Bright wooden restaurant interior with tables, chairs, plants, and large windows letting in natural light
9 March 2026
Mesh enhances energy efficiency & sustainability at Westonbirt Arboretum. Contact us to learn about our eco-friendly solutions.

Subsribe to memo from mesh