Education


Villiers High School

How we helped:

  • Energy strategy planning
  • Building physical modelling
  • Overheating and ventilation analysis
  • Embodied carbon analysis
  • Daylighting analysis
  • Initial MEP strategy benchmarking
  • RIBA 2030 Climate Change targets

We have wide-ranging experience of working with schools to improve the sustainability and efficiency of their estates and campuses.


Many UK schools were built at the beginning of the 20th Century, with additional buildings added across the decades using varying levels of construction quality.


The result is a mismatch of thermal regulation, energy efficiency, and safety levels that now causes issues with constrained school budgets and the health and wellbeing of students and staff.


Villiers High School in Southall is a state secondary that has been exceeding expectations in every area in recent years. Judged ‘outstanding’ in every category by Ofsted, the school planned to use some of their resources to future proof their site for their 1,700 students and staff.


Mesh was brought on by the Director of Finance and Facilities, to undertake a post-occupancy energy review and to advise on a potential renewable approach to low-carbon on-site energy generation and use throughout the school campus.


The Mesh team initially visited the school where they were able to assess the varying ages and architectural styles of the buildings. Some of the buildings were built in the  early 20th Century civic architecture, with high thermal mass, generous floor to ceiling heights, and large areas of glazing, while the later 1960s and 1980s additions are also typical of their time and use.

Villiers High School entrance sign and red brick building.

Mesh's building performance engineers analysed the historical energy use of the campus, based on energy data and survey analysis, before creating a whole-site ‘digital twin’ to map that usage against the campus buildings. 


The aim of the study was to evaluate the energy usage and identify areas for improving performance and to allow for greater insight and reliability for cost saving recommendations. This stage also included a specific overheating and ventilation study to refurbish and retrofit the school’s main hall so it could be used as a theatre.


We then reviewed and refined a range of renewable heating and hot water solutions and to help the client understand the practical feasibility, key economic considerations, and long-term benefits of a final system strategy. 


The existing campus energy strategy was a gas boiler providing space heating and hot water. The school is naturally ventilated.


It was noted that the heating system was in the process of being upgraded, with new insulated heating pipework installed overhead. Our report suggested that installing a bivalent ground source heat pump with bore holes could offer a more viable renewable alternative to the current gas boilers, which is something the school have since asked for support with for their Stage 4 planning application.


This ongoing partnership is led on principles of placemaking and sustainability for the school’s students, staff, and the wider community it serves.